Integrated Earthworks Solutions, Inc

+1(915) 207-3686

  • Home
  • Core Values
  • Services
  • Qualifications
  • Value Engineering
  • Projects
  • Equipment
  • Careers
  • Gallery
  • Videos
  • Contact
  • More
    • Home
    • Core Values
    • Services
    • Qualifications
    • Value Engineering
    • Projects
    • Equipment
    • Careers
    • Gallery
    • Videos
    • Contact
Integrated Earthworks Solutions, Inc

+1(915) 207-3686

  • Home
  • Core Values
  • Services
  • Qualifications
  • Value Engineering
  • Projects
  • Equipment
  • Careers
  • Gallery
  • Videos
  • Contact

Explore Our Projects

Our extensive client base is a testament to our top quality earthwork services. Some of whom are listed below:

  • American Industries building (150,118 ft2)
  • Bader building (136,813 ft2)
  • Bodycote building (173,958 ft2)
  • Conform building (108,605ft2)
  • Continental building (298,790 ft2)
  • Hirotec building (160,166 ft2)
  • ITT koni building (262,413 ft2)
  • Lear building (20,054 ft2)
  • Lear expansion building ( 270,238 ft2)
  • Mitsui building (196,850 ft2)
  • Play Club building (36,209 ft2)
  • UGN building (290,625 ft2)
  • kamax building (126,411 ft2)
  • Flutec building (110,811 ft2)
  • Scherdel building (48,235 ft2)

UXO Clearance at Castner Range

image19

Contract Number: W912DY-10-D-0027


Statement of work


  • Conduct brush clearance along 115 miles of pre-surveyed transects at the AOI North of Castner Range, EL Paso, TX. Transect lines are marked with flagging tape. Gilbane will conduct the transect survey and marking.


  • Brush must be cut to 4-6 inches above the ground surface, allowing unrestricted passage of a tracked bobcat towing a geophysical array.


  • Transect must be a minimum of 60 inches wide.


  • Brush may either be masticated, chipped and left on site, or pushed to the outsides of each transect.


  • Adhere to Gilbane Safety protocols and UXO site supervision.  

 

  • Percent Complete: 100 %
  • Completion date: 6/24/2019
  • Owner: United States Army Corps of Engineers/Kemron Environmental Services, Inc.
  • Location: Castner Range Remediation Services. Fort Bliss El Paso County, TX.
  • General contractor:  Gilbane Federal

Forestry mulching

Brush clearance along 115 miles of pre-surveyed transects at the AOI North of Castner Range, EL Paso, TX. 

Socorro Independent School District -New Auxiliary Gyms-

Lujan Chavez

Benito Martinez

Benito Martinez

image20

Statement of work


Construction of a single-story Auxiliary Gym approximately 5200 Square Feet in size.


  • Percent Complete: 100 % Building Pad and Exterior works.
  • Completion date: 4/30/2020
  • Owner: SISD
  • Location: El Paso, TX
  • General contractor: Pride General Contractors, LLC.

Benito Martinez

Benito Martinez

Benito Martinez

image21

Statement of work


Construction of a single-story Auxiliary Gym approximately 5200 Square Feet in size.

 

  • Percent Complete: 100 %  Building Pad and Exterior works.
  • Completion date: 4/30/2020
  • Owner: SISD
  • Location: El Paso, TX
  • General contractor: Pride General Contractors, LLC.    

Elfida Chavez

Benito Martinez

Elfida Chavez

image22

Statement of work


Construction of a single-story Auxiliary Gym approximately 5200 Square Feet in size.


  • Percent Complete: 100 %  Building Pad and Exterior works.
  • Completion date: 4/30/2020
  • Owner: SISD
  • Location: El Paso, TX
  • General contractor: Pride General Contractors, LLC. 

Hellen Ball

Sgt. Roberto Ituarte

Elfida Chavez

image23

Statement of work 


Construction of a single-story Auxiliary Gym approximately 5200 Square Feet in size.    

 

  • Percent Complete: 100 %  Building Pad and Exterior works. 
  • Completion date: 4/30/2020
  • Owner: SISD
  • Location: El Paso, TX
  • General contractor: Pride General Contractors, LLC.  

O'Shea Keleher

Sgt. Roberto Ituarte

Sgt. Roberto Ituarte

image24

Statement of work     

 

Construction of a single-story Auxiliary Gym approximately 5200 Square Feet in size.


  • Percent Complete: 100 %  Building Pad and Exterior works. 
  • Completion date: 4/30/2020
  • Owner: SISD
  • Location: El Paso, TX
  • General contractor: Pride General Contractors, LLC.   

Sgt. Roberto Ituarte

Sgt. Roberto Ituarte

Sgt. Roberto Ituarte

image25

Statement of work      


Construction of a single-story Auxiliary Gym approximately 5200 Square Feet in size.

 

  • Percent Complete: 100 %  Building Pad and Exterior works. 
  • Completion date: 4/30/2020
  • Owner: SISD
  • Location: El Paso, TX
  • General contractor: Pride General Contractors, LLC.   

Timber Retaining wall construction at montesillo complex